Structural Engineering · Stage 05 of your project

The part you'll never see,
and the part that matters most.

Open-plan kitchens, wider openings and new loft rooms all depend on the right steel, in the right place, sitting on the right foundations. Our structural engineering is designed alongside your drawings, not bolted on afterwards, so building control approves it and your builder can build it.

Included in Capital Build and Capital Complete. Engineering by our qualified structural and civil engineers.

Wide bi-fold opening spanning the rear of a brick house

When do you need a structural engineer?

If your project changes how your home carries its weight, you'll need structural calculations. That usually means:

  • Knocking through a load-bearing wall, such as a kitchen-diner
  • Rear, side return and wraparound extensions, especially with wide glazed openings
  • Loft conversions: new floor joists, steel beams and often a dormer
  • New or wider openings for doors, bi-folds or windows
  • Removing chimney breasts
  • Two-storey extensions and anything above an existing structure
  • Basements, underpinning or signs of movement

Building control will ask to see calculations for these changes before approving the work.

What the calculations cover

A structural package tells your builder exactly what to install and tells building control why it works.

ElementWhat we specifyWhy it matters
Steel beamsSize, grade, and how they're fixed and protectedCarries walls, floors and roofs above new openings
Padstones and bearingsWhat each beam sits on and how the load spreadsStops concentrated loads crushing masonry
LintelsOver new doors and windowsSupports the wall above each opening
Floor and roof joistsSize, spacing and directionEssential for loft floors and flat roofs
FoundationsType, width and depth for new wallsSuits your soil, trees and nearby drains
Existing structure checksWhether walls and foundations can take new loadsLofts add weight; some homes need strengthening
Temporary worksPropping sequence during constructionKeeps your home safe while walls are removed
Fire protectionProtection to structural steel where requiredPart of meeting building regulations

Existing walls and foundations must be checked when loads increase, and underpinning is sometimes needed (Planning Portal).

Coordinated, not bolted on

When the design and engineering are done by separate firms, details fall between the gaps: a beam that clashes with a ceiling height, or a foundation that runs into a drain. We coordinate them from the start.

  1. Design review: our engineer reviews the design early, before the layout is fixed
  2. Site information: survey data, and trial holes or a drainage survey if needed
  3. Calculations and details: beams, foundations and connections, matched to the building regulations drawings
  4. Building control submission: included in your building regulations package
  5. Support during the build: we answer your builder's structural questions on site, included in our service

Don't pay for steel you don't need

Over-cautious engineering is expensive. Oversized beams cost more to buy, need more labour to lift and can mean a deeper ceiling. We design for what your home actually needs: safe, compliant and not over-specified. That also keeps builders' quotes lower.

Other permissions structural work can trigger

Structural work often brings other legal steps with it. Missing them is a common cause of delayed start dates, so we flag them early.

Party wall notices

If you're working on a shared wall or digging foundations near a neighbour's, the Party Wall etc. Act 1996 usually applies.

WorkNotice typeMinimum notice
Cutting into or altering a shared wall (e.g. inserting steel beams)Party structure notice2 months
Building a new wall on or at the boundary lineLine of junction notice1 month
Excavating within 3m of a neighbour's building, deeper than its foundationsAdjacent excavation notice1 month
Excavating within 6m, where the dig crosses a 45° line down from their foundationsAdjacent excavation notice1 month

Your neighbour has 14 days to respond. If they don't reply, it's treated as a dispute, and party wall surveyors are appointed to agree a legally binding award. The person doing the work normally pays those costs.

Build-over agreements

Planning to build within 3 metres of a public sewer or 1 metre of a public lateral drain? You'll need an agreement from your water company before work starts. That's usually Thames Water in London.

Thames Water classSewer sizeFee*
Class 1Up to 175mm£130
Class 2176–350mm£490
Class 3Over 350mm£585 + legal costs from £1,000

*Thames Water's published homeowner fees; these change each April, so check the current figure. Class 1 and 2 agreements usually take a few weeks; Class 3 can take months.

Some drainage can't be built over at all, including manholes and rising mains. Your foundation design has to allow for that.

Credentials

  • Qualified structural and civil engineers with UK experience
  • £1 million professional indemnity insurance
  • Engineering coordinated with your drawings under one roof

What does it cost?

Our fee: fixed, and quoted after your free assessment. It depends on how complex the structure is. Engineering is included in Capital Build and Capital Complete.

FAQs

Questions about structural engineering.

Can't see yours? Ask a designer.

Do I need a structural engineer to knock down a wall?

If the wall is load-bearing, yes. It's supporting floors, roof or walls above, and building control will need calculations for the beam that replaces it. Not sure if it's load-bearing? We'll check.

What's the difference between structural calculations and building regulations drawings?

Calculations prove each structural element is strong enough. Building regulations drawings show how everything fits together: structure, insulation, fire safety, drainage. Building control needs both, so we produce them together.

Do loft conversions always need steel beams?

Not always, but most do. New floor joists are almost always needed, and dormers and roof alterations usually need steel. The existing walls and foundations must also be checked for the extra weight.

How long do structural calculations take?

Typically around 2 weeks once the design is fixed. Because they're coordinated with your building regulations package, they don't add a separate wait.

My builder says they can size the beam themselves. Is that OK?

Building control will still need calculations from a competent person. A builder's rule-of-thumb sizing often leads to oversized, more expensive steel, or to delays when building control asks for proof.

Will I need a party wall surveyor?

Only if your neighbour doesn't agree in writing, or doesn't reply within 14 days. We identify which notices your project needs early, so there's time to serve them before your builder's start date.

Can I build over a drain?

Often, yes, with a build-over agreement from your water company. Some drains, such as manholes, can't be built over. We check drainage early because it can change the foundation design.

Next step

Get the structure right first time.

Engineering designed alongside your drawings, with party wall and drainage checks flagged before they cause delays.