Building Regulations · Stage 04 of your project

Planning gets you permission.
Building regulations get it built properly.

Our building regulations package turns your approved design into drawings and specifications your builder can work from, and building control will sign off. It's coordinated with your structural calculations and flags party wall and drainage issues before they reach site.

Included in Capital Build and Capital Complete. Drawings are usually ready within 2 weeks of planning approval.

Kitchen extension with a roof lantern and bi-fold doors to the garden

Planning permission and building regulations are not the same thing

Many homeowners think planning approval is the finish line. It's actually the halfway point.

Planning permissionBuilding regulations
What it controlsWhat your project looks like and how it affects neighbours and the streetHow it's built: structure, fire safety, insulation, ventilation, drainage
Who decidesYour local council's planning departmentCouncil building control, or a private Registered Building Control Approver
Is it always needed?No, many projects are permitted developmentAlmost always, for extensions, loft conversions and structural changes
What we producePlanning drawings and supporting documentsTechnical drawings, specification and coordinated structural information

Permitted development means you may not need planning permission. You'll still need building regulations approval.

Do I need building regulations approval?

Almost certainly, if you're:

  • Building an extension
  • Converting a loft or garage into a room people live in
  • Removing or altering a load-bearing wall
  • Adding or moving a bathroom or kitchen drainage
  • Replacing a roof covering or windows (often through a competent person scheme)
  • Carrying out notifiable electrical work

Usually not, for:

  • Like-for-like repairs and redecorating
  • Most small detached outbuildings under 15m² with no sleeping accommodation
  • Ground-level conservatories and porches under 30m², with safety glazing, separated from the house by external-quality doors, and with no extension of the home's heating system

If you're not sure, ask us. It's a two-minute question on a free project call.

Choosing your approval route

There are three ways to get building regulations approval. We'll recommend the right one for your project.

Full Plans application (what we usually recommend)

Your drawings are checked before work starts. Building control must decide within 5 weeks, or 2 months if you agree to extend. Approval lasts 3 years. You know your design complies before a builder prices it, so there are no surprises on site.

Building Notice

No plans are checked in advance, and work can start 2 days after the notice is submitted. It's faster on paper but riskier: problems are found during construction, when they cost most to fix. A Building Notice can't be used if you're building over or near a public sewer, which is common with rear extensions.

Registered Building Control Approver (private)

Instead of the council, you can appoint a private approver registered with the Building Safety Regulator. You and the approver jointly give an Initial Notice to the council, which has 5 working days to reject it. Once it's accepted, and the approver has had 2 working days' notice, work can begin. Private approvers are often more flexible on site-visit timing.

Already started or finished without approval? Only the council can grant retrospective approval, called regularisation. It may mean opening up finished work for inspection. We prepare the drawings you'll need.

What's in our building regulations package

  • Technical plans, sections and elevations, detailed for construction
  • Specification notes covering materials, insulation and build-ups
  • Fire safety strategy, including protected escape routes for loft conversions
  • Thermal details to meet current insulation standards
  • Ventilation and extract layouts
  • Drainage layout, with sewer proximity checked
  • Coordinated structural calculations: beams, padstones and foundations (see Structural Engineering)
  • Door and window schedule
  • Submission to building control and responses to their queries
  • Early warnings on party wall notices and build-over agreements, flagged before they delay your start date

The regulations, in plain English

The Building Regulations are explained through a set of official guides called Approved Documents. These are the ones that matter most for home extensions and loft conversions.

PartCoversWhat it means for your project
AStructureNew beams, lintels, joists and foundations must be designed to carry the loads.
BFire safetyLoft conversions need a protected stair route with fire doors, and mains-wired, interlinked smoke alarms on every level.
CDamp and site preparationDamp-proofing, weathertightness and ground conditions.
ESoundSound insulation between rooms, and where walls are shared with neighbours.
FVentilationBackground vents and extract fans, especially in kitchens and bathrooms.
HDrainageFoul and rainwater drainage, including building near public sewers.
KFalls and collisionsStair dimensions, balustrades and safety glazing.
LEnergy efficiencyInsulation levels for walls, floors and roofs, and window performance.
MAccessMainly new homes: level access and WC provision.
PElectrical safetyNotifiable electrical work by a registered electrician, or checked by building control.

How it works and how long it takes

  1. Brief and review: we check your approved planning drawings and confirm the approval route. Days 1–2
  2. Technical design: drawings, specification and structural coordination. Usually within 2 weeks
  3. Submission: Full Plans decision within 5 weeks (or 2 months with your agreement), or an Initial Notice with a private approver (5 working days)
  4. Inspections: building control visits at key stages, such as foundations, drainage, structure and insulation
  5. Completion certificate: issued once the work is signed off. Keep it safe.

What does it cost?

Our fixed prices for building regulations drawings:

ProjectPrice
Loft conversion£525
Single-storey extension£600
Creating new flats£600
Wraparound extension£675
Double-storey extension£1,050
New buildPriced per project

Save with a bundle: book building regulations drawings with a measured survey and the second item is half price, from £750 for both. Structural engineering is priced for each project.

Drawings are available across England. Prices are final: there's no VAT to add.

Building control fees are paid separately to the council or private approver. As a guide, one London borough's 2026/27 schedule (Havering, including VAT):

ProjectFee
Garage conversion, up to 30m²£673
Extension or loft conversion, up to 30m²£859
Extension or loft conversion, 30–60m²£1,183
Extension or loft conversion, 60–100m²£1,406

Fees vary by council and project size; figures were correct in September 2026. We'll confirm the exact fee for your council.

Your responsibilities as a homeowner

Since October 2023, everyone involved in building work, homeowners included, has legal duties under the Building Regulations. The good news: as a domestic client, your duties normally pass to your builder (or principal contractor). They can pass to your designer instead if agreed in writing.

What that means in practice:

  • Appoint people with the right skills and experience
  • Where more than one contractor is involved, a principal designer and principal contractor must be appointed in writing
  • Capital can act as your principal designer for the design stages

Why the completion certificate matters

  • Selling your home: buyers' solicitors ask for it. Missing certificates cause delays, price reductions or failed sales.
  • Enforcement: councils can require non-compliant work to be altered or removed up to 10 years after completion, and fines are unlimited.
  • Insurance and mortgages: lenders and insurers may ask for proof that the work was approved.
FAQs

Questions about building regulations.

Can't see yours? Ask a designer.

I have planning permission. Do I still need building regulations approval?

Yes, in almost all cases. Planning covers how the project looks and affects neighbours. Building regulations cover how it's built. Permitted development projects need building regulations approval too.

Full Plans or Building Notice: which should I choose?

For extensions and loft conversions we almost always recommend Full Plans. Your design is checked before builders price it, so quotes are more accurate and problems don't surface mid-build. A Building Notice isn't allowed at all if you're building over or near a public sewer.

Council building control or a private approver?

Both check the same regulations. Private approvers must be registered with the Building Safety Regulator and can be more flexible on inspections. Only the council can approve work retrospectively.

How soon can building work start?

With Full Plans, work can start before approval is granted, but it's safer to wait for the decision (up to 5 weeks). With a private approver, the council has 5 working days to reject the Initial Notice. After that, work can start once the approver has had 2 working days' notice.

How much are building control fees?

For a typical extension or loft conversion in London, expect roughly £700–£1,500 including VAT, depending on your council and project size. We'll confirm the exact figure.

My extension is close to a drain. What do I need?

If you're building within 3 metres of a public sewer, or 1 metre of a public lateral drain, you'll need a build-over agreement from the water company, usually Thames Water in London, before work starts. Your building regulations application must also be Full Plans. We check this early.

What happens if I don't get a completion certificate?

You may struggle to sell or remortgage, and the council can require changes up to 10 years later. If work has already been done, regularisation through the council can put it right.

Who is responsible for building regulations: me or my builder?

Legally everyone involved has duties, but a homeowner's duties normally pass to the builder or principal contractor. Choosing competent, insured professionals is the most important thing you can do.

Next step

Know it's right before your builder starts.

Coordinated drawings, structural calculations and a clear route to sign-off, all from one team.

Prefer to talk? Call 07925 229936 or email Nahyan@capitalarchitecture.co.uk

Call usFree assessment →